Active Projects Listing

The following listing are active Wake Tech projects.

Project Overview

Classification:
Capital Project
Campus/Location:
Eastern Wake 4.0

This project is comprised of an 110,000 GSF classroom and student services building, including general chemistry and biology labs, biopharma labs, student services spaces, library and individualize learning areas. The project also includes associated extension of chilled water and heating water piping systems and the extension of roadways and parking.

Budget & Financing Information

Total Budget:
$69.7M
HUB Goal:
25%

Project Status

Design:
May 2021
Construction:
Fall 2023
Anticipated Occupancy:
Winter 2024
HUB:
--

Project Contacts

Wake Tech Project Manager:
Sarah Burnette
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Monteith Construction
Designer:
BSA LifeStructures

Project Overview

Classification:
New Building Project
Campus/Location:
Eastern Wake 4.0

This project will construct a reality‐based simulation center for training programs based in law enforcement, emergency medical service, and fire rescue. The facility will include a training track to support emergency driver training, CDL training and motorcycle training. The simulation complex building is anticipated to be 70,000 square feet and will provide a 4D Immersive Interior Training Village, including a two‐story downtown street replica, along with multi‐function and specialty training rooms supporting law enforcement and fire/emergency rescue reality‐ based training. Unmanned aerial systems and flight training tied into future Industry 4.0 mechatronics programs supporting high tech student training will also be incorporated into the facility. The project also includes associated extension of chilled water and heating water piping systems and the extension of roadways and parking.

Budget & Financing Information

Total Budget:
$49.0M
HUB Goal:
20%

Project Status

Design:
January 2021
Construction:
Fall 2023
Anticipated Occupancy:
Winter 2024
HUB:
--

Project Contacts

Wake Tech Project Manager:
Daniel Edwards
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Balfour Beatty
Designer:
Boomerang

Project Overview

Classification:
Capital Project
Campus/Location:
Eastern Wake Education Center

This project will provide a 20,000 square foot energy plant to house chillers and boilers providing distributed hot and cold water for heating and cooling purposes throughout the campus. Intense energy savings and sustainability will be incorporated through the means of efficient systems derived from advanced solar and geothermal technologies. In addition, this project provides for the initial site clearing, excavation and grading; the installation of roads, bridges and access points; and the construction of appropriate site drainage and retention ponds, etc. to support the first phases of the site development.

Budget & Financing Information

Total Budget:
$64.0M
HUB Goal:
20%

Project Status

Design:
January 2021
Construction:
Fall 2022
Anticipated Occupancy:
Winter 2022
HUB:
--

Project Contacts

Wake Tech Project Manager:
Jorge Salazar
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Skanska
Designer:
HH Architecture

Project Overview

Classification:
Capital Project
Campus/Location:
Beltline Education Center

Construction of a 28,000 GSF addition to the Beltline Education Center to house the new Wake Works program, as well as a mechatronics/robotics lab for process training.

Budget & Financing Information

Funded by Building Owner
Total Budget:
HUB Goal:
%

Project Status

Design:
Complete
Construction:
August 2021
Anticipated Occupancy:
August 15th, 2021
HUB:
--

Project Contacts

Wake Tech Project Manager:
Jeffrey Carter, PE
Wake Tech HUB Coordinator:
The building owner provided funding for this project
Builder/General Contactor:
Spec Con, Inc.
Designer:
Influence by DESIGN

Project Overview

Classification:
Capital Project
Campus/Location:
Southern Wake Campus

This project consists of improvements to the 10,460 sf Power Mechanics classroom & laboratory facility and the welding labs in Ready Hall. Phase I will renovate the interior and exterior of the old plumbing and gas in Ready Hall to convert them into new Stick and MIG/Gas welding labs. Scopes of work includes new lighting, electrical, plumbing, mechanical and structural upgrades needed to create a functionally safe and environmentally sound program. Phase II includes a feasibility study to assess and prioritize the programs and projects within the Power Mechanics and Ready Hall buildings. Program prioritization includes Residential Electric, Refrigeration, building upgrades, and select demolition.

Budget & Financing Information

2018 Bond Program
Total Budget:
$6.8M
HUB Goal:
10%

Project Status

Design:
September 2020
Construction:
August 2021
Anticipated Occupancy:
Summer 2021
HUB:
12%

Project Contacts

Wake Tech Project Manager:
Jorge Salazar
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
BridgePointe General Contracting, Inc.
Designer:
Duane Hutchins, Boomerang Design

Project Overview

Classification:
Capital Project
Campus/Location:
Southern Wake Campus

35,000 GSF of facilities management shop/office space and 12,000 GSF of warehouse/office space. Programs include: Facilities maintenance and management, including carpentry shop, metal shop, HVAC repair, plumbing repair, electrical repair, paint booth, key shop, landscaping equipment repair, outdoor/indoor storage, warehouse, inventory control and office space. In addition, the Facilities programs dealing with Design & Construction, Energy/Sustainability and Transportation will be housed in this facility.

Budget & Financing Information

Total Budget:
$19M
HUB Goal:
10%

Project Status

Design:
March 2018
Construction:
Summer 2022
Anticipated Occupancy:
Summer 2022
HUB:
21%

Project Contacts

Wake Tech Project Manager:
Jorge Salazar
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Resolute Building Co.
Designer:
Williard Stewart Architects

Project Overview

Classification:
Capital Project
Campus/Location:
Southern Wake Campus

This project provides a 34,000 GSF laboratory building containing new labs to replace existing older labs in various buildings and provides for skilled training in a modern teaching environment to match the technology and instructional needs of today and into the future.

Budget & Financing Information

Connect NC Bond $9M
County Funds $3M
Total Budget:
$12M
HUB Goal:
10%

Project Status

Design:
July 2018
Construction:
Ongoing
Anticipated Occupancy:
Fall 2021
HUB:
18.7

Project Contacts

Wake Tech Project Manager:
Jorge Salazar
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Monteith Construction
Designer:
Davis Kane Architects

Project Overview

Classification:
Capital Project
Campus/Location:
Scott Northern Wake Campus

Project consist of 100,000 GSF buildings comprising of 75,000 GSF of automotive/collision repair lab space and 25,000 GSF of classroom space. Programs include, but not limited to; Automotive Systems Technology including diagnostics and repair of electrical/electronic systems, emissions, brakes, engine performance, steering, suspension, transmission, climate control, diesel fuel systems, alternative fuel systems, collision repair and general education classes.

Budget & Financing Information

Total Budget:
$42M
HUB Goal:
10%

Project Status

Design:
July 2019
Construction:
April 2021
Anticipated Occupancy:
Fall 2021
HUB:
20.5%

Project Contacts

Wake Tech Project Manager:
Daniel Edwards
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Brasfield & Gorrie General Contractors
Designer:
Gensler Architects

Project Overview

Classification:
Capital Project
Campus/Location:
RTP Campus

This project constructs a 63,614 GSF building classroom building and includes the construction of a 315-space temporary parking lot and a 200-space permanent parking lot. This building will be supplied with chilled water and heating water from the existing energy plant in RT1, but will allow for new boilers, chillers, pumps, etc. to be added to the existing energy plant for the additional capacity. The energy plant in RT1 will provide enough cooling and heating capacity for RT1, RT2 and RT3.

Budget & Financing Information

Total Budget:
$46.9M
HUB Goal:
20%

Project Status

Design:
February 2020
Construction:
Ongoing
Anticipated Occupancy:
Fall 2021
HUB:
24%

Project Contacts

Wake Tech Project Manager:
Sarah Burnette
Wake Tech HUB Coordinator:
Carla Daniels
Builder/General Contactor:
Rodgers Builders
Designer:
O’Brien Atkins